$435,000

2778 Moose Gantt Trail, Crouse, NC 28033

  • 3 beds |
  • 3 baths |
  • 2,030 sqft
  • Property Icon Single-Family Home
  • Property Year Built Icon Built in 1992
  • Property Lot Size Icon1.6acre lot
  • Property Parking Icon —— car garage
  • Property Price Per Square Feet Icon $214/sqft
  • Property List Date Icon Listed 3 days ago

Property Description

!!!Escape to Country Living: Your Peaceful Retreat Awaits!!! Discover the perfect blend of comfort, character, and outdoor leisure in this charming 3-bedroom, 2.5-bath home. Spanning over 2,000 square feet, this property offers a serene country lifestyle while keeping you connected to everything you need. **Main Level Highlights** The heart of the home is designed for both relaxation and effortless hosting! Living & Dining: The spacious, open-concept living room provides a welcoming atmosphere, complemented by a formal dining room perfect for holiday gatherings or dinner parties. Chef’s Kitchen: Enjoy your morning coffee in the bright breakfast nook, which offers lovely views of the expansive backyard. Primary Suite: Enjoy the privacy of a main-level primary bedroom featuring a walk-in closet and elegant French doors that open directly onto your back deck. **Upstairs Living** The upper level continues the thoughtful layout, featuring: Two additional bedrooms, each equipped with spacious closets. Convenient attic access for extra storage. A full guest bathroom. A lofted landing that overlooks the living area, creating a wonderful sense of openness and connection throughout the home. **Outdoor Oasis** Situated on over 1.5 acres of land, this home is built for outdoor enjoyment! * Relax & Entertain: Start your day on the inviting covered front porch, or transition to the back deck for sunset grilling and weekend entertaining.* Cool Off: Steps away from the deck, you’ll find your private in-ground pool—your personal sanctuary for hot summer days. ***Whether you are looking for a peaceful escape from the hustle and bustle or a wonderful space to grow and host friends, this home provides the space and setting to make lasting memories.***

Listing Status:
Active
Data Last Updated:
July 31, 2026 at 9:16PM
Listing Office:
Century 21 Town & Country Rlty : 704-735-1425
MLS ID:
4407300
  • General: Attic OtherEntrance FoyerPantryWalk-In Closet(s)
  • Appliances: DishwasherDisposalElectric CooktopRefrigerator
  • Laundry: Electric Dryer HookupInsideLaundry RoomMain Level
  • Flooring: CarpetLaminateVinylWood
  • A/C: Heat Pump
  • Heating: Heat Pump
  • Fireplace: Living RoomWood BurningFireplace
  • General: Outbuilding
  • Style: Cape Cod
  • Other Structures: Front PorchDeckCovered
  • Parking: Attached CarportDriveway
  • Roofing: Architectural Shingle
  • Windows: Insulated Window(s)
  • General: Site BuiltCrawl Space
  • Road/Access: AsphaltPaved
  • Originating MLS: carolina
  • County: Lincoln
  • Zoning: R-SF14861
  • Fencing: Chain Link
  • Water: Well
  • Sewer: Septic Installed
  • Source: carolina

This listing courtesy of Century 21 Town & Country Rlty

Monthly Payment

$Est. Payment
  • Principal & Interest $
  • Property Taxes $
  • Home Insurance $
  • VA Funding Fee $

Ready to Start a VA Loan?

Get Started Veterans United Home LoansNMLS #1907  †
Interest rates used in the VA mortgage calculator are shown for illustrative purposes only. Your rate may differ based on a variety of factors, including your credit score and the current market conditions. To get your personalized interest rate, start your quote online.

Location

Similar Listings Nearby